Home
About Us
Projects
Samples of our projects
Pipeline design and installations for new CAN line from Krones
Water treatment unit (Complete plant from CENTEC.de)
Pipeline design and installations for CIP unit from Krones
Pipeline design and installations for CIP unit from ADUE in Coca ABI
PET line installations – KRONES line
Water distribution battery
Utilities room re-allocation with pipe line fabrication and commissioning
Re-allocating Ammonia chiller with installations and commissioning with the plant
Supply Syrup tanks with connections to syrup network
Installing compressed air system with exhause duct
Relocating Re-allocating some equipment
Relocating Ammonia chiller with installation and commissioning
Supplying and fabricating new syrup dissolving unit
Installing a compressed air system with an exhaust duct
Pipeline design and installations for CIP unit from ADUE in Coca Assiut
Treated water distribution header for Coca Tanta
Services
Turn key Electro-Mechanical projects
Supplying materials
Energy optimization
FMCG Consultancy
All Services
Contact us
Home
About Us
Projects
Samples of our projects
Pipeline design and installations for new CAN line from Krones
Water treatment unit (Complete plant from CENTEC.de)
Pipeline design and installations for CIP unit from Krones
Pipeline design and installations for CIP unit from ADUE in Coca ABI
PET line installations – KRONES line
Water distribution battery
Utilities room re-allocation with pipe line fabrication and commissioning
Re-allocating Ammonia chiller with installations and commissioning with the plant
Supply Syrup tanks with connections to syrup network
Installing compressed air system with exhause duct
Relocating Re-allocating some equipment
Relocating Ammonia chiller with installation and commissioning
Supplying and fabricating new syrup dissolving unit
Installing a compressed air system with an exhaust duct
Pipeline design and installations for CIP unit from ADUE in Coca Assiut
Treated water distribution header for Coca Tanta
Services
Turn key Electro-Mechanical projects
Supplying materials
Energy optimization
FMCG Consultancy
All Services
Contact us
Utilities room re-allocation with pipe line fabrication and commissioning
Home
Utilities room re-allocation with pipe line fabrication and commissioning